|
|
|
|
|
OPERATIONAL SEQUENCE 1. INPUT THE DATA AS INDICATED IN THE BOXES BELOW 2. PRESS SEND BUTTON BELOW TO POST DATA TO PipePredictor.comSM's COMPUTERS 3. WITHIN 20 TO 30 MINUTES, COMPLETE RESULTS WILL BE RETURNED TO YOU BY E-MAIL (VIEW SAMPLE OF EXECUTIVE SUMMARY) |
|
|
|
THIS
FORM IS IN METRIC UNITS.
CLICK LINK IF YOU REQUIRE YOUR INPUT TO BE ENGLISH STANDARD |
|
Click
here if you need to make data conversions (will stay on top until closed)
|
|
Pipe
Material Specification |
Ring
1 |
Ring
2 |
Ring
3 |
Ring
4 |
Ring
5 |
Ring
6 |
Ring
7 |
||
|
Pipe is Submerged: |
kg/m3 (outside fluid specific weight, 0 if N/A) |
|||
|
Pipe is Flooded: |
kg/m3 (inside fluid specific weight, 0 if N/A) |
|||
|
Water Depth: |
m |
|
CoM: Center of Mass |
|
|
CoB: Center of Buoyancy |
||||
|
Floating
Construction Facility |
Note3: Floating Construction Facility, Hang-Off and CoM/CoB data will be used by program to calculate composite oscillations involving rolling and pitching. Leave default values if you don't require Dynamic Analysis or choose to force your own Heaving values (see Heaving note5 below) |
Position of Hang-Off point from stern/centerline |
|
Position of CoM/CoB from stern/centerline |
|
Length: |
m |
Longitudinally Y(H): |
m |
m |
|
Width: |
m |
Athwartships X(H)*: |
m |
Longitudinally |
|
Depth: |
m |
Height
above CoM |
m |
|
|
Draft: |
m |
* Absolute value, always positive |
|
|
|
Facility's oscillations |
Amplitude (0 to max) |
First Natural Period |
Fixed Position |
Call for special environment |
|
Rolling: |
deg |
seconds |
Note4: “Fixed Position” means facility's horizontal geographic position is made constant by use of Dynamic Positioning or tight anchoring |
|
|
Pitching: |
deg |
seconds |
|
|
|
Heaving (see foot note5): |
m |
seconds |
|
|
|
Heaving
note5:
If you need the computation to reflect your own composite heaving
behavior, just set rolling and pitching values to zero and input
heaving figures only. |
||||
|
|
|
|
|
|
|
|
|
|||
|
PipePredictor.comSM Code |
|
PLEASE DO NOT REMOVE CODE |
|
|
|
|
|
|
|